2.By the engineering checking of the selected target section we found the gold mine in both prospecting trench and randing, and gained 1.5t gold resource.
通过对优选靶区的工程查证,探槽、浅井双双见矿,共获得黄金资源量1.5。
3.A series of laboratory cementing experiments on the total tailings from a gold mine in Shandong Province were conducted by use of ordinary cement and polyhydrate material as binding materials.